ServerNet · Data Center

Infrastructure planner & server calculators

Translate workload needs into capacity, power, rack space and budget before requesting a quote. Calculations run in your browser.

RAID usable capacity

A simple estimate for equal-sized drives. Raw capacity and usable space differ.

Raw capacity (TB)—
Theoretical usable capacity (TB)—

Before filesystem, snapshot, hot-spare and formatting overhead; RAID is not backup.

Rack space estimator

Enter the occupied units and reserve room for growth.

Calculated minimum (U)—
First common size to investigate (U)—

Height estimate only; separately verify depth, rails, load and cooling.

UPS capacity estimator

Enter measured load and power factor for an initial capacity estimate.

Required real power (W)—
Required apparent power (VA)—

This does not size batteries or electrical circuits. Use manufacturer runtime charts and qualified review.

Virtual machine resource estimate

Calculate total requested memory and vCPU for your virtual machines.

RAM with growth allowance (GB)—
Requested vCPU total—

vCPU is not a physical core; host overhead and oversubscription require workload assessment.

Buy or rent?

Compare an owned server with rental over the same time and currency.

Purchase and running cost—
Total rental cost—

Use the same currency for all inputs; account for residual value and tax separately if relevant.

Request configuration and consultation

Compare models and specifications. Request configuration, availability and condition for new or refurbished equipment.

Request configuration and consultation